Showing posts with label zimmerman. Show all posts
Showing posts with label zimmerman. Show all posts

Testing the Invisible Tunnel

Tunnel_transferIf you haven't seen my previous posts about the invisible/virtual tunnel connecting the two Farragut stations, you may want to read them for background (1st post, 2nd post, 3rd post). In short, the technology exists to allow Metro riders to transfer between the two Farragut stations and treat them as though they were transferring within the system. Metro should implement this idea immediately, since there is no downside, many riders will save time, and congestion at Metro Center will be reduced.

Recently I had a meeting at American University, which provided me the perfect opportunity to try out the transfer for myself. I was traveling from Arlington, so I followed the route shown in the diagram above, getting off at Farragut West, walking up 17th Street to Farragut North and then taking the red line to Tenleytown. I made the same trip in reverse on the return.

I took a stopwatch with me to see how long it would take. For the initial trip I reached the top of the escalator at exactly the wrong time to cross I St. and had to wait the full light cycle. I waited about 25 seconds to cross K St. I was standing on the platform at Farragut North 5' 13" after the doors opened on my train at Farragut West. On the return trip I arrived on the street during the walk signal at K St. but had to wait about 20 seconds at I St. Farragut_tunnel I was on the platform 4' 10" from the time the train doors opened at Farragut North. I did not run. I walked at a normal able-bodied speed. Someone in a hurry could make this transfer faster; if one stands on the escalators, it will take longer.

So what does this mean? In both cases I then had to wait a little bit for the train, so I likely ended up on the same one as I would have had I made the usual transfer at Metro Center. However--particularly on the return trip--had I arrived on the platform just in time to catch a train, that train would almost certainly be one train earlier than what I would have caught at Metro Center.

Based on this one experience, I would guess that a person making this transfer during rush hour will catch the earlier train at least a couple of times a week and possibly as much as half the time if they hustle. During periods with longer periods between trains, one will catch the earlier train less frequently, but it will save a lot more time when it happens.

The bottom line is that the transfer works and many riders will learn how to take advantage of it if it's made available to them. If you work at Metro or know who to contact to help push this forward, please do so. If you're a rider who would avail themselves of the transfer, please contact Metro and request it. I know that Chris Zimmerman has made at least one inquiry about it; perhaps he can continue to pursue this along a faster timeframe than sometime in 2010--if ever (see most recent post). A woman named Cyndi Zieman was recently put in charge of SmarTrip cards. Perhaps she can take a leadership position and make this happen. It's a no brainer; let's build the invisible tunnel!

(cross posted on Greater Greater Washington)

More of the Invisible Tunnel

Farragut_tunnel_2_4I'm pleased that my recent post about creating a virtual tunnel between the Farragut stations has gotten some notice, which may actually be helping to move this idea forward. Blogs that have picked it up include:

Greater Greater Washington

Beyond DC (19 comments on this one)

Chuck Coleman's Random Thoughts blog included an electronic communication he had with Shiva Pant, sitting in for John Catoe, on a lunchtime chat. Pant indicated that the electronic transfer is in the works.

I had a personal conversation with someone at Metro, too. He told me something similar: the SmarTrip software is being significantly upgraded to allow for a lot more functionality with the cards (evidently, SmarTrip cards aren't all that smart right now). The capability to do transfers like this is being included in the software upgrade, but it's at least 9 months out before that upgrade will go into place. He said that he had heard that Chris Zimmerman had inquired internally about it. I don't know if that was because of my communication with Mr. Zimmerman or not, but I'm glad that he's engaged.

However, and this is important, just because the SmarTrip upgrade will include the capability to do this transfer, doesn't mean it will go into effect at that time! My contact said that the "business side" of the system has to be addressed, too. . .and that could take six months. It may be necessary to amend the fare tariffs to include this change, and that requires public input and other meetings, etc.--which take time.

So Metro needs to get started on that part of the process now. Exwmata
That way, the "virtual tunnel" transfer can go into effect immediately upon the upgrade. Those of you who read this blog and have any contacts at Metro, please help out by checking to make sure the institutional infrastructure is prepared, too.

I read the fare tariff, and, in my opinion, I'm not sure any changes would actually be necessary. Currently, fares are determined by distance without any specific issues associated with transfers at L'Enfant or Metro Center or elsewhere. No fare tariffs would have to change if a physical tunnel were built between the stations. So I think one could interpret the tariff as already accommodating all transfers--whether they are through a physical tunnel or electronic tunnel shouldn't make any difference.

However, knowing bureaucracies like Metro, they'll figure out a way to make it a months' long process, so anything we can do to get that started should start now.

And a final soapbox. I believe that if Mr. Catoe directed staff to put this transfer in place now, it could get done in a matter of weeks. My contact said the current software is capable. Waiting for the upgrade is a convenient excuse. But every day that goes by costs Metro riders 30-100 hours of wasted time (my best guess) not to mention the lost opportunity of reduced congestion at Metro Center.

Build the Invisible Tunnel!

Farragut_tunnel_2I can't take credit for this idea--I read it somewhere else--but it's so good that it needs to be promoted and publicized until Metro takes notice and implements it.

The idea of linking the Farragut North and Farragut West metro stations with a tunnel has been around a long time (I found a W. Post article from 1994 that mentioned it) and makes good sense. WMATA published a comprehensive study of the tunnel option, including capacity and ridership impacts, etc.in 2004. The primary impediment to building the tunnel is money. WMATA's recent Station Access & Capacity Study estimates a cost of about $25 million.

The tunnel is a great idea and probably should have been built at the time the system was built. In the meanwhile, while we wait, the technology exists to build a virtual tunnel right now. Right now!! And there is absolutely no reason WMATA shouldn't. Ridership's about to pick up again in September, so let's create the virtual tunnel right away.

What is the virtual tunnel? Simple. Metro riders who have SmarTrip cards can leave one Farragut station and enter the other station within a certain time window--say, 10 minutes--and not be charged, a free transfer (click on the image above for a map/diagram). The 2004 tunnel study estimated about 15,000 people per day would transfer using the underground tunnel (using 2003 ridership numbers). Given the greater inconvenience of going up on the street and coming back down and having to cross two intersections (300 steps from faregate to faregate. . .I counted), fewer would choose to use the virtual tunnel than a real one, but still thousands per day I would guess. That would relieve pressure at Metro Center as well as convenience the passengers who choose to take advantage.Smartrip

Here's the key point: there is no downside to implementing this idea. No downside. No studies required. No excuses to put it off. Repeat: no downside. All it takes is a little computer programming and a press release to get the word out. It adds flexibility to the system at virtually no cost. No one will be additionally inconvenienced, since passengers are more than welcome to continue to use the system as usual: if you don't want to make the transfer and walk, just keep using Metro Center as before. I have wracked my brain and cannot think of a single negative impact--all pros and no cons. If someone can think of a downside, please comment and let me know what it is.

I sent a note to Arlington Board member and WMATA Board Chair Chris Zimmerman a couple of months ago recommending he push this idea to WMATA, but I didn't hear back. I don't know the ins and outs of making things happen at Metro, but this is a no-brainer; they should just do it. And what better time than right now?