Why is simple so hard? New Washington Flyer Coach to Dulles schedule is not intuitive.

Silver Line service started up this last weekend, and with it new Washington Flyer coach service to Dulles airport.  The new service runs from the Wiehle Avenue station direct to Dulles and back.  Fare is $5 each way.  (Previous service was from West Falls Church and cost $10 each way).

The new service is more frequent, too.  Here's a link to the schedule.  For weekdays buses run every 15 minutes from 6am to 9am; every 20 minutes until 3pm; every 15 minutes until 7pm, and then every 20 minutes until 10:40.  This schedule is relatively easy to remember without needing to carry it with you, because the service coincides with the top of the hour.  I.e. 6:00, 6:15, 6:30, etc..

However, the weekend schedule is not intuitive.  Buses run every 20 minutes all day from 7:45am to 10:45 pm.  But instead of running on the intuitive and easy to remember :00, :20, :40, they run on the non-intuitive :05, :25, :45. 
Why? 
What is the point of making the schedule difficult to remember for riders when it would have been so very simple to just start and end the service on weekends 5 minutes earlier?  I don't get it.

Hooray (maybe) for the Farragut Crossing - a true story

Last week I went to an event near the Van Ness metro.  I started home about 10pm, taking the Red Line from Van Ness towards downtown DC.  Prior to the introduction of the Farragut Crossing transfer, I would have changed to the Orange Line at Metro Center.  However, with the advent of this potential time saver, I planned to exit at Farragut North, walk to Farragut West and catch the Orange Line from there.  If the timing worked out, there was a possibility I would catch a train that was one train ahead of the one I would have otherwise caught.  That could save me 12-20 minutes--well worth it.

What I failed to anticipate (and one of the disadvantages of the tunnel being "invisible.") was that it would be pouring rain at Farragut Square.  I mean just sheets of rain, with thunder and lightning.  Yow!  I stood for a moment with two dozen others at the top of the escalator shielded from the storm.  I could see the Farragut West entrance beckoning me just 500 feet away.  I retreated back down the elevator, figuring I would use the usual transfer.  But then I went back up to see if maybe the rain was slowing down.  It wasn't, so I went back down.  Next train to Metro Center: 20 mins.  Now I was regretting getting off my train at all.  Back up.

The walk signal turned in my favor on K Street, so I made a spontaneous decision and a mad dash, covering the total distance in under a minute.  It didn't matter, though, I got thoroughly soaked anyway.

The awesome outcome was that an Orange Line train going my way pulled up just as I got to the platform.  This was probably the same train I would have been on had I changed at Metro Center originally (only drier).  The first passenger I saw when I boarded the train said, "I just got a text from my friend saying it was raining, and I see she is right."

The Multi-Mode, Car-Free trip to the party

On Monday I attended the Queen's Day celebration at the Royal Netherlands Embassy in Washington DC.  As it turned out, the trip to and from utilized numerous modes of travel that all added together to make for an interesting trip as shown on this map.


View Steve's Multi-Mode Car-Free Trip in a larger map

Here's how it went, with the travel mode for each segment shown in BOLD:

Farragut "Virtual" Tunnel (Farragut Crossing) Now Operational

I don't know if I should claim any credit for this finally happening, but I have been fairly vocal about it for a long time on several forums.  Finally on Saturday, October 29, 2011, the "Farragut Crossing" virtual/invisible tunnel transfer option began between Farragut North and Farragut West stations.


Here's the first line from my original post below:
"I can't take credit for this idea--I read it somewhere else--but it's so good that it needs to be promoted and publicized until Metro takes notice and implements it."
That was August 30, 2008, 38 months ago.  I'm glad to see it finally happened, but it's a bit discouraging to see that a no-brainer idea like this one can take so long.  Imagine how long something expensive or contentious would take.

For history buffs, here's a comprehensive listing of all my posts and some other relevant links.

Farragut "Virtual Tunnel" close to reality (after only 3 years!)

The Washington Post reported today that Richard Sarles has included in his first 6-month report as full-time Director of Metro, that the "Virtual Tunnel" between the Farragut stations will be functional this fall.

I first promulgated this idea almost three years ago on the CommuterPage blog and have followed up numerous times since (More of the Invisible Tunnel, Testing the Invisible Tunnel, Now Even More Invisible?, Metro's response). Here's what the Post said today:  "In his first six-month report since being hired as Metro’s permanent chief, Sarles also said the agency will create a 'virtual tunnel' between Farragut North on the Red Line and Farragut West on the Orange and Blue lines, allowing riders to go from one station to the other without paying a new fare."

Why it took this long is a bit of a mystery.  Metro has been tying this service to changes in the SmarTrip card, which are finally just now being completed.  However, I learned way back in 2008 that the capability has always existed--even with paper farecards--to implement this service.

It will be interesting to see how popular the tunnel is once the ridership is educated about it.

Another missed opportunity to provide better service on Metro during track work

Metro has another opportunity to provide enhanced shuttle service to Orange Line riders the next two weekends while they perform work on the tracks. Thousands of hours could be saved by travelers with an intelligently designed and managed shuttle service.

Metro has announced that shuttles will run between East Falls Church and West Falls Church stations. Between West Falls Church and Vienna trains will single track while workers perform track work in this area. Metro's announced plan is to operate single-tracked trains on 24-minute headways between WFC and Vienna.

As I suggested previously (and received a reply from Metro), a better strategy for customers would be to not run trains at all for the three stations west of East Falls Church. Instead, they should run express shuttles from Vienna to East Falls Church and a secondary shuttle serving the other two stations.
There are approximately 20,000 boardings and deboardings at the three westernmost stations on a Saturday, divvied up as follows:

Metro's "Service Nearby" tool

Last summer a friend of mine moved to a new apartment in Alexandria, an area of town he was not particularly familiar with.  He got in touch with me about trying to find a good way to commute by transit to his job in DC.  He knew that I was pretty savvy at figuring out the transportation system.

I pointed him to Metro's "Service Nearby" tool as a first step in figuring out his various options.  The tool identifies all the transit stops within 1 mile.  One can then use that information to look at schedules or use the Trip Planner to determine various ways to go where you want to go.  The trip planner does not always provide the complete list of options (and often not even the best options), so using "Service Nearby" can be really helpful.

Rationalizing services between Shirlington and the Pentagon

Travelers between Shirlington and the Pentagon have more than 160 buses in each direction per day that they can ride. However, the design of the bus bays and the lack of combined schedules creates inconvenience for passengers, requiring them to choose between bus bays that are far apart and knowing multiple schedules, among other issues that could be rationalized.

There are several routes between Shirlington and the Pentagon: Metrobus routes 7A, C, E, F, Y; 22A; 25A, D; and ART87. The 7 and 25 buses are express, traveling directly between these two stations in 6-9 minutes depending on traffic. The 22A makes a few stops before getting on I-395, resulting in a travel time of about 12-14 minutes. The ART bus takes a local route that takes about 23-27 minutes. (In almost all cases, those traveling between these two endpoints will get there sooner by waiting for the next, quicker Metrobus than taking the ART.)  There is also an ART 87X, which is express to the Pentagon during rush hours.

How Much Congestion does the Clean Fuel Exemption Cause on I-66 Inside the Beltway?

Hybrids and other clean-fuel cars are exempted from the HOV requirement on I-66.  All traffic inside the beltway on I-66 must be HOV-2, be a motorcycle or have a clean fuel exemption license plate.  Dr. Gridlock at the Washington Post has argued to remove this exemption to help the HOV lanes function better.  It has been my opinion that the problem was caused more by scofflaws--that is, single occupancy drivers illegally on the road--than the hybrid cars.

Today I had a chance to test my presumption.  I was crossing over I-66 on the pedestrian overpass near Madison Manor park (map).  I tried to notice how many cars were scofflaws but soon realized that it was difficult to tell if there was a child in the back seat or not.  Also, many of the cars had the clean-car license plates.  Then I realized I could read the license plates easily.  Traffic seemed to be traveling about 30-40 miles per hour, slower than free-flowing.  So one could argue that there was congestion, since the HOV lanes were not moving at 55 miles per hour.  So I started counting.

Plates with CF, CX, CY or CZ are exempt from the HOV requirement.  (One can have their vanity plate exempted, too, but there were few of these).  I pulled out a piece of paper and a pen.  Here's what I observed in six minutes from 8:04 to 8:10 AM.
  • 333 cars: 67 with clean-car license plates; 266 without.
  • 1 motorcycle
  • 2 buses
  • 1 18-wheeler (which are illegal on this highway)
  • 1 eastbound 6-car Metro train
Of the cars, 67 had clean car license plates, approximately 20%. 

Here's some quick math extrapolating to an hour and making some assumptions:
  • 2700 HOV cars with 2.2 riders = 6000 people
  • 670 clean-fuel cars with 1.1 riders = 750 people
  • 20 buses with 40 people = 2000 people
  • 10 metro trains with 800 riders = 8000 people
So the clean-fuel cars represent less than 5% of the people being transported along this corridor but represent 20% of the cars.  Would removing that 20% increase flow enough or more than enough to make up the difference.  My intuition says yes, but perhaps a transportation planner can weigh in on the comments.

My First (mostly positive) Experience Using Capital Bikeshare

Today I had a great opportunity to try out my new membership to Capital Bikeshare.  I was attending a 1/2 day seminar at the Hilton Hotel on Connecticut Avenue, north of Dupont Circle.

Since I take the Orange Line from Arlington, I decided to disembark at Foggy Bottom and ride up to the conference, allowing me to skip the transfer at Metro Center.

The station at Foggy Bottom is not yet in place, so I had to walk two blocks east to the station at 21st & I Streets.  There were about 12-15 bikes at this station, ready to go.  It was pretty easy; I just inserted my fob in the slot, the light turned yellow, then green, and the bike unlocked.  I put my bag in the rack and secured it with the attached bungee and headed up 20th Street.

(View Steve Offutt's bikeshare map from October 1 2010 in a larger map)

At first I did not notice the station at 20th & Florida.  I had misremembered the location as being at 19th and Florida.  When I got there, I did not see a station.  I called the toll-free number on the bike and was directed to the station by a customer service agent.  The reason I had missed it was because it is a much smaller station and there was only a single bike in it.

About noon I left my event and went back to the station for the return trip.  Unfortunately, there were no bikes at 19th & Florida.  I walked to Dupont Circle to the station on Massachusetts avenue and got a bike there.  During the time I got that bike, two other people did as well.  I had a short conversation with a woman who was using one for the first time and was very excited about it.

I rode back to 21st & I, returned the bike, walked to Foggy Bottom and took the Metro home.  I saved 95 cents over the fares I would have paid had I taken the Metro to Dupont.

From this experience, it appears that the system is getting used:
  • At least two others must have used the station near the hotel, since the two bikes that were there when I went in were gone when I came out.  
  • The station at Dupont was used by two others just in the few minutes I was there
  • The station at 21st & I Street had clearly been used numerous times over the 3 hours between my two visits, because the bikes were all moved around from their original locations.
Here's hoping they get the rest of the stations opened pronto--particularly downtown stations in advance of the Metro shutdown during Columbus day weekend.

Can Capital Bikeshare get up and running in time for Metro shutdown?

(Photo by M. V. Jantzen)
I recently sent this note to the contact person at DDOT working on the new Capital Bikeshare system.

=======================
Hello,
Just in case you were not aware, Metro is planning major maintenance and a huge shutdown on the Orange & Blue lines for Columbus Day weekend.
Farragut West, McPherson & Metro Center will be closed (Red line in Metro Center will be open, though). People will be shuttled from Foggy Bottom and Federal Triangle.

This is an enormous opportunity to show the value of Capital Bikeshare.  All those Orange & Blue Line riders who deboard at Foggy Bottom or Federal Triangle are going to be trying to get somewhere from there. Also Red line riders downtown wanting to transfer. Waiting for the shuttles is going to be a nightmare I'm certain. As you deploy the new stations, it would be really smart to focus on those that serve the affected areas before Columbus Day weekend (which is 11 days away). Think of the awesome marketing when your members deboard at Foggy Bottom, hop on a bike and happily ride off while everyone else stands in an enormous crowd of people trying to shove onto a line of buses. PR and media dream, too.  Don't miss this chance of a lifetime.   Perform well and you will gain hundreds of members just by being in the right place at the right time.

If I were you, I would totally focus on these stations for the next week:
  • South of Massachusetts
  • West of 6th St. NW
  • North of Constitution
  • East of New Hampshire/24th St.
I count 17 stations in that area, but almost none are up and running except around GW.  At the very least you will want to have the metro stations covered along with the station at RRB not far from Federal Triangle.  Better would be to have all 17 in full service.

I'd like to post something on Greater Greater Washington and CommuterPage about how CaBi is the solution to the shutdown, so if you can let me know which stations will be in service before October 8, that will help a lot.  I hope it's all of them.
Good luck,
Steve

The Solution to the Pole Hogs

While in Barcelona recently, I had the opportunity to experience their metro system.  They have a simple solution to one of the problems often experienced by Metro riders in DC: pole hogs.  Some riders of the DC Metro will lean against the stanchions or otherwise make it difficult for several people to hold onto a single stanchion.  In Barcelona, many of the trains have these (see photo).  I wish I had taken a photo from farther away, because the top and the bottom of the stanchion are a single pole just like in DC, but the center section splits into three--allowing more people to comfortably hold on in the same amount of space.  This appears to be a solution that could be retrofit in existing cars by cutting out the center of an existing stanchion and welding on these midsection portions.

Photo by Jaume Meneses on Flickr
You can see another view of them in this photo to the right:

The Barcelona Metro also uses waiting time countdown clocks like the DC Metro. . .except theirs counts down to the second.  And they're pretty accurate, too.  This one shows the next train is expected in 1 minute and 41 seconds, which is pretty much exactly when it arrived:

Blue Line Reroute - Deja Vu 30 Months Later

Brownline[1]


(Since I posted this, a better solution with more comments has appeared on Greater Greater Washington.  Check it out.)

Dr. Gridlock in the Washington Post, discussed today the potential rerouting of some metro trains across the Yellow Line bridge over the Potomac rather than through the Rosslyn tunnel.  Old news.  Virtually the same article was written by Lena Sun in February 2008.  Same question: should they make a new color?  Yes, of course, as I blogged here over two years ago .  (For more on how we name routes, check out my blog post on that here.)

There appears to be a pattern.  The same problems just keep plaguing Metro.  I've been reading about the escalator problems (and experiencing them personally) for more than a decade--along with this passenger who writes in today's post. Robert Thompson (Dr. Gridlock) replied thus:

"The current generation at the transit authority includes some pretty smart people. The consequences of the escalator design have been widely known and discussed since the 1990s. Is it not reasonable to
expect that these smart people would be well on their way to solving the problems they inherited?  Instead, the transit authority remains far better at articulating the problems than at solving them
."

Likewise with the invisible tunnel.

If the rerouting of the trains across the Potomac instead of under it is a good idea, then quit talking about it and do it.  Yes, deciding what to call it is an issue, but surely that is not what is keeping it from being implemented.


(cross posted on CommuterPage)

Metro's Response to Latest "Invisible Tunnel" Query


The idea of a virtual tunnel between the two Farragut stations on Metrorail was the subject of several of my posts about two years ago (first, second, third, fourth). The idea is to allow passengers to exit one Farragut station and enter the other within a set period of time, counting the whole thing as a single trip rather than two trips.

Given that Metro is currently making significant changes to its fares, I suggested to Interim General Manager Sarles that now would be a good time to also incorporate this long overdue idea for several reasons:
  • Metro staff is already working on making many changes, so it would be more efficient to implement now than come back and make more changes later.

  • Many customers are understandably unhappy about fare increases. Implementing the invisible tunnel would provide a positive change in operations that would add convenience for some of your riders to help offset some of the negative PR that comes with fare increases.

  • It's a no-brainer: It decreases congestion at Metro Center, provides a speedier ride for some customers and has absolutely no downside whatsoever.
Mike Russo, Metro's Assistant Chief Engineer for Automatic Fare Collection Systems, told me that they support the idea, but it "will not be an easy programming effort" because of memory limitations in the faregates, but that they hope to "re-examin[e] the Farragut transfer concept later this year" after the current fare changes are done. Here is the complete text of his letter:

Metro Responds to Shuttle Bus Suggestion

Metro responded to my suggestion for Orange Line shuttle buses I posted over at Greater Greater Washington. During Memorial Day weekend and the following two weekends, Metro is suspending Orange Line service between East Falls Church and West Falls Church and replacing them with shuttles. My original post suggested a different set of shuttles than just one between those two stations.

I had forwarded it to Mr. Sarles as a commenter on GGW, John Bennett, suggested. Here is the reply:

Dear Mr. Offutt:
Thank you for your May 25, 2010 email message to Richard Sarles, General Manager of the Washington Metropolitan Area Transit Authority (Metro), with suggestions regarding Orange Line shuttle service during our upcoming closures between East Falls Church and West Falls Church Metrorail stations. Mr. Sarles always welcomes input from our riding public and asked that I respond to your suggestions.

When planning for service disruptions, we keep several priorities in mind: customer convenience, service reliability, funding availability and clear communications.

For the upcoming weekends, we looked at a variety of shuttle options including the one you have suggested. We decided on one free shuttle between East Falls Church and West Falls Church stations because:
  • One shuttle would cost less to operate than running multiple shuttles with multiple station destinations. It was the most cost-effective option and we are committed to using our resources wisely.

  • Travel time for multiple shuttles would be heavily impacted by traffic on I-66, which is subject to numerous delays (predictable and unpredictable) especially during the holiday weekend. Without delays on I-66, travel time would most likely be equal.

  • Communicating the operation of one shuttle is less confusing to the customer. The one-shuttle method most resembles a 'normal' commute on the Orange Line. If you have multiple shuttles, there are more opportunities for people to board incorrect buses, thus creating more frustration and inconvenience for our riders.
For these reasons, we have opted to operate one shuttle. However, we will evaluate the shuttle operation after this weekend and make any adjustments necessary to minimize customer inconvenience, maximize our funds, preserve service reliability and maintain clear communications for subsequent work. I will ensure your input is considered in the evaluation process.

I hope you find this information helpful. Again, thank you for your suggestions.

Sincerely,

James J. Hughes
Managing Director
Office of Intermodal Planning

I was pleased that I received a thoughtful response. Kudos to them.

I suspect that their cost analysis did not include the cost savings from not running the trains. I find it hard to believe those savings would not be fairly large. Whatever shuttle system they operate will need to transport the same number of passengers (all of them), so the alternate system would only need to be marginally larger to make for better customer service, not outrageously larger.

(This post also cross posted on Greater Greater Washington)

Photo of EFC station by MV Jantzen

Monday What's on the Web: Greater Greater Washington

Every Monday I highlight other bloggers or web contributors who are making important or interesting contributions to climate, sustainability, transportation or market transformation. Check back each week for another installment.
----------------------------
Greater Greater Washington is a regional blog focused on the Washington DC area. In just a couple of years it has grown to become a highly respected and widely read resource for people interested in issues that affect the current and future Washington DC metro area. Many days it garners over 20,000 page views.

Issues run the gamut, but often focus on transportation and development as drivers for the future. The blog takes a very new urbanist angle on these issues--tending to suggest ideas like complete streets, increased and improved transit, increased costs for driving and parking, better bike facilities, mixed-use and transit-oriented development, etc. It reflects the goals of this blog in that it is working towards positive transformation that will improve our environment and quality of life.

David Alpert runs the blog and has actually become a known person to some in the local media (some like him; some don't). It is clear that some staff at Metro and local jurisdictions read the blog and may actually be taking ideas from it. There are several dozen contributors, and the blog runs several posts a day--so the content is always changing as well as substantial. I am one of those contributors, and you may see my posts here.

Metro Capitalizes on Ubiquity of Buses to Provide Text-Based, Real-Time Traffic Information

Metro launches its new real-time, eyes-on-the-road, traffic texting service today, April 1, 2010. Metro’s recent budget woes have led the agency to pursue both cost-cutting and revenue-enhancing measures. It has also given the agency impetus to look at its strategic assets in new ways. By working with the consulting firm Nozirev, the agency identified its bus fleet as a potential source of new revenues. Metro buses blanket the area, particularly during rush hours, and can provide real-time eyes to traffic situations. (This post is an April Fool's post)

Through a sophisticated texting system, Metrobus operators will respond personally to specific requests for traffic information in their vicinity. This allows commuters to make decisions about what route to take, when to plan their trip, or whether to even bother getting out of bed.

The system is simple to use. Send the text “WMATA” to 96272 (WMATA). You’ll instantly receive the response, “Service requested?” Then reply with “RTRTT” for “Real-Time Regional Traffic Texting.” The response will read, “Are you sure you want RTRTT?” Reply with “Y” or “Yes;” the system will recognize either one and will reply with, “Location requested?”

This is where knowing some shortcuts can really help. You can try texting in something like “Rockville Pike Southbound near White Flint,” which may or may not be clear enough for the system to understand. Instead, by using the 2nd, 3rd and last letter of the street name and ‘N to indicate “and” (as in “Rock ‘N Roll”), you can be assured of a correct identification. Also, for the quadrants of DC, just imagine the map rotated 45 degrees counterclockwise to save a letter. This way, NW becomes W and NE becomes N, etc. Here are some easy examples:

- Georgia Avenue and Military Road, NW is simply coded in as: EOA ‘N ILY W
- Pennsylvania and Branch Avenue SE is easily identified as: ENA ‘N RAH E

Single letter and numbered street names retain their identity, e.g., 23rd Street is 23 and U Street is U.

Reactions to the new system have been almost universally positive. Jake Danvers, who rides the 32 bus on Wisconsin Avenue said, “It works great for me. My driver is telling all those car commuters to go some other way, and that clears the road for us. My ride is a good 2-3 minutes faster now. Also, it’s more exciting. Yesterday, for example, we sideswiped a BMW and knocked over a newsstand. Since our driver didn’t notice, it didn’t cost me any time on my commute. Also, I’ve noticed cars and pedestrians really stay out of the way of the careening bus, so there’s more room for us to barrel down the road.”

Prince William resident and long distance commuter Doris Morris also gushed, “Not only do I get right up-to-date information, the bus drivers’ text notes are often entertaining.” Metrobus has encouraged drivers to inject some personality into their texts as a way of personalizing the service. Metrobus 5A driver Vinny Soros is known for his salty language, with some texts like these:
“No f*&^@in’ way ur gonna b on time! LOL”
“That’s a s*@$tload of taillights up there!”

In contrast, Doreen Phillips, who drives the S2 likes to make biblical references:
“Pslm 37 - Be still in the presence of the Lord”
“Colssns 3:8 But now u must rid yourselves of all such things as these: anger, rage, malice, slander, n filthy language from ur lips.”

A favorite among many commuters is Sokudo Wamatayi, a Japanese American originally from Brooklyn, who occasionally mixes in a relevant haiku:
“Blossoms of pale pink
Universally beckon
Fuhgeddaboudit”

Relevant text information is retained for five minutes, so if another commuter requests information from the same location, they receive the retained text. This safety feature was designed to reduce distractions for drivers. Implementation studies showed that with this system feature, even the drivers with the busiest routes were able to focus on the road more than 70% of the time while still providing extremely accurate information.

Anyone can use the service without registration. Individual texts are $.50 not including costs from your service provider. Daily users, though, can register for unlimited service for only $19.95 per month. Visit www.metroopensdoors.com/OMG.

---------------------
Photo attribution for crushed newsrack: http://www.flickr.com/photos/frankfarm/ / CC BY-NC-ND 2.0

The Last Mile in Tysons Corner

My recent post regarding solutions to the "last mile" problem in Tysons has been cross-posted to Greater Greater Washington and has been picking up some good comments. Take a look. It will be followed by additional posts with some different viewpoints.

Tyson's Corner Circulator Buses - Take a Book Along

This recent article in the Washington Post raised the important question of providing transportation within the Tysons Corner area to supplement the new Silver Line Metro service. Even with the new Metro stations, Tysons will remain a spread-out, edge city with long distances between buildings, large parking lots and uncomfortable walking infrastructure, at least in the short term. Even the most visionary land-use plans to transform Tysons to a more pleasant, transit-oriented development, idyllic urban space will take at least a generation to realize, if not longer.

In the meanwhile, people will need to get from the Metro stations to their destinations that may not be within walking distance or may be difficult to walk to. Hence the proposal to run circulator buses as described in the article. The article also points out that there is no money for the buses.

Without some sort of supplemental transportation, a significant part of the value of building the Silver Line will be lost. Currently there are thousands of reverse commuters from DC, Arlington and Alexandria who work in Tysons. Unless their work places are right near the new stations, many of them will continue to drive. After all, there's no HOV requirement in the reverse direction, most parking is free, and it will be so much more convenient to go right to your work place.

Even the buses themselves will be significantly suboptimal. They will need to deal with the same traffic as the cars. Passengers will have to wait for them at both ends. If your stop is later on the route, you'll have to sit through a half-dozen earlier stops. For a lot of situations, it might take fifteen minutes to get from the Metro station to a building only a mile away. That's as long as it would take to drive all the way from the Potomac River to the building. Some sort of supplemental transportation is needed, but circulator buses--unless they can somehow be separated and given priority--will be barely adequate.

The Tysons Land-Use task force recommends that eventually that be the case:
"The vision of a transformed Tysons calls for transit services linking the four future Metrorail stations with the rest of the Urban Center. As described above, these services may begin as shuttle buses serving Metro stations and evolve over time. A second phase may be buses operating in mixed traffic. A third phase may be buses operating on exclusive rights-of-way, followed by a fixed guideway system operating on exclusive rights-of-way." (from Transforming Tysons, Fairfax County's Department of Planning and Zoning, Feb. 2009)

What if Tysons were to leap forward to that vision now--become a visionary leader and try a radical departure from the inside-the-box transportation thinking? I believe a PRT system in concert with the Silver Line could be a catalyst for much more rapid and significant transformation of Tysons. It solves the last-mile problem elegantly. One could travel between any two points, non-stop, within Tysons in less than ten minutes. In and of itself it would attract people and businesses to Tysons. It's possible it could even pay for itself through revenues and through support from businesses (think hotels) that would support having it serve their building directly. I don't know how much support for the circulator buses might come from the businesses, which the Tysons task force has suggested. I suspect not much. It also eliminates the costs of phasing buses in and then out. It starts with the fixed guideway system from the beginning.

As Lincoln said "As our case is new, so we must think anew and act anew." Buses are not new. Even streetcars are not new. Why not think anew and act anew? Many people are thinking hard about how to make Tysons new. Why not take grasp of a new vision of how to make Tysons an extraordinary place--not just the old Tysons, only better? I think creating a comprehensive PRT system in Tysons will create an example that could be imitated in scores of other places in the region and the nation, creating a true transformation of our urban spaces and our transportation paradigms.

More Silver Line Dreaming

I live not far from the East Falls Church Metro in Arlington VA, and so I have seen some of the actual construction of the Silver Line (Metro's 17-mile extension to Dulles Airport)--which certainly makes it more real after many years of talking and debating.

Recently there were a couple of posts discussing the Silver Line and a discussion of a high-speed link from Dulles (here and here). Ideas included triple tracking the Silver Line or creating a new line along the W&OD trail.

I think there is another opportunity that planners are missing (and it's probably too late without an additional big investment), that would be really visionary. Make sure the rail infrastructure being built at the junction with the Orange Line can accommodate connections to a future line that continues southeast along Route 7 through Falls Church and Fairfax County to King Street and all the way into Old Town Alexandria. Call it the "Gold" Line. Done right, it would be underground most or all of the way and would be accompanied by land-use policies that would re-create the entire corridor.

Imagine if planners in Fairfax took the long view like Arlington did thirty years ago and created the incentives and plans that would transform this road like the Rosslyn-Ballston Corridor in Arlington has been transformed. Stops would be relatively closely spaced to encourage transit-oriented and pedestrian-oriented development.

I realize this is a pipe dream, but I like to dream. One can imagine stops along the way at:
-West Falls Church Metro
-Falls Plaza
-Broad and Oak (or thereabouts)
-Broad and Washington (center of Falls Church)
-Seven Corners West
-Seven Corners East
-Near Nevius St. (close to Jeb Stuart High and several large apartment complexes and the Culmore shopping center)
-Baileys Crossroads West
-Baileys Crossroads East
-Jefferson Street/George Mason (allowing connections to the Columbia Pike streetcar line)
-Walter Reed/Beauregard
-(one or two intermediate stops along this next stretch as it crosses I-95)
-Quaker Lane/Braddock Road
-(this next 1.8 miles is all single-family residential--not sure where good stops would be)
-King Street Metro/VRE
-One or two stops into Old Town

Here's a notional map.

I'm not an engineer, so I have no idea how possible the actual construction might be. I do believe that a vision like this, though, could have a huge positive transformative effect on a big section of an already densely populated--but poorly planned and designed--area of Fairfax County. It would also connect the West Falls Church station with the King Street station, moving toward more of a web and less of a hub-and-spoke design for Metrorail, which is reflective of how our region has evolved.

Given how enormously expensive and controversial a project of this scope would be, and the obstacles that tend to stand in the way of expanding the heavy rail MetroRail system (how many years for the Silver Line? being a case in point), one could also imagine other options for this corridor with different solutions and possibly different futures.

Given that Arlington County and Fairfax County are working together on the Columbia Pike streetcar, which will cross Route 7 at Jefferson St. and terminate near Route 7 and Carlin Springs, adding extensions to that project (which is hinted at in this map), would allow for a more incremental approach. Extending the streetcar or creating a new streetcar line from the Columbia Pike streetcar line terminus near Bailey's Crossroads west to Falls Church or east to Alexandria would create impetus to improve land use and urban design along those sections (assuming smart and committed county leadership).

Effectively designed light rail would also be easier to add other linkages to, such as connections to Shirlington--either along Walter Reed Drive and Arlington Mill Road or via Quaker Lane. The line could also split from King Street with another line along Braddock Road to the Braddock Road Metro, then connecting north to Potomac Yards. Arlington County has also been looking at the possibility of a Pentagon City to Potomac yard streetcar, so these two could then tie together. These kinds of additions and extensions would be much more difficult with a Metrorail type project.

This road, Route 7/Leesburg Pike, is not just a traffic disaster in Tyson's Corner, but pretty much for its entire length east from there to Alexandria (try navigating Seven Corners most anytime!). It cannot be fixed with more or differently configured asphalt. It requires a new and imaginative vision--a vision that takes advantage of and builds on the density that is already there.